
Our Work
Read about some of our recent work
Read More
Nationwide Starlink Installation Rollout
Partners:
Telesol, Blue Networks & GTT
Location:
Nationwide, UK
Date:
2026
Services:
Site surveys, Starlink satellite equipment installation, external mounting, Power over Ethernet cabling, network equipment installation, connectivity testing and commissioning
Project Overview:
KMS Communications worked in partnership with Telesol, Blue Networks and GTT to deliver a nationwide Starlink installation programme for the end client, European Metal Recycling Limited (EMR). The rollout covered approximately 70 operational sites across the United Kingdom.
Our scope included site surveys, installation planning, secure mounting of Starlink satellite equipment, internal and external cable routing, Power over Ethernet connectivity, network equipment installation, testing and final commissioning.
​
The project required detailed regional scheduling, coordination of multiple installation teams and consistent delivery standards across a geographically dispersed estate. Each installation included photographic evidence and completion documentation, reinforcing our commitment to Knowledge, Mastery and Support, delivering reliable connectivity with minimal disruption to EMR’s operations.

Ciena 6500 DWDM Network Deployment and Commissioning
Partners:
Entegro
Location:
Various locations across the UK
Date:
2026
Services:
Technical staging, rack installation, power integration, card and module population, fibre connectivity, management integration, commissioning and validation of Ciena 6500 DWDM platforms
Project Overview:
KMS Communications works in partnership with Entegro to support the deployment of carrier-grade Ciena 6500 Dense Wavelength Division Multiplexing (DWDM) infrastructure across the UK.
The scope includes staging, installation and commissioning of Ciena 6500 platforms across 2-slot, 7-slot, 14-slot and 32-slot shelf configurations. These deployments support a range of optical transport schemes, including new DWDM rings, Reconfigurable Optical Add-Drop Multiplexer (ROADM) nodes and Optical Line Amplifier (OLA) sites.
​
Each deployment is completed in accordance with scheme-specific engineering documentation. Activities include equipment preparation, chassis and rack installation, power integration, population and verification of specified cards and optical modules, equipment-side fibre connectivity, management connectivity and commissioning checks.
​
The platforms incorporate technologies such as wavelength-selective switching, optical performance monitoring, line amplification and optical supervisory channels. Detailed verification ensures each network element is correctly built, commissioned and ready for integration into the wider optical transport network.
​
This partnership demonstrates KMS Communications’ capability to deliver technically complex DWDM infrastructure consistently across long-haul and metro network environments.
Structured Data Cabling Installation
Partners:
Surrey Data Cabling
Location:
Manchester, UK
Date:
2026
Services:
Structured data cabling installation, cable routing, termination and labelling
Project Overview:
KMS Communications worked in partnership with Surrey Data Cabling to deliver structured data cabling installation works at a construction site in Manchester.
​
The cabling infrastructure was installed and routed throughout the site, with the required terminations and labelling completed in accordance with the project specifications. The work required close coordination with other contractors, adherence to site health and safety requirements and consistent installation standards throughout the programme.
This project demonstrates KMS Communications’ ability to deliver organised and reliable structured cabling installations within active construction environments.
Read More
Network Equipment Installation
Partners:
Indigo & Google
Location:
Shropshire, UK
Date:
Ongoing
Services:
Installation of Juniper switches, QSFP modules, and fibre connectivity
Project Overview:
KMS Communications is working in partnership with Indigo and Google to deploy high-performance network infrastructure across Europe. Our team is responsible for installing Juniper switches, integrating QSFP modules, and managing fibre cabling to support advanced data transport capabilities. This work spans multiple countries and requires a high degree of technical precision, consistency, and coordination. With each installation, we reinforce our commitment to Knowledge, Mastery, and Support — delivering robust connectivity that powers global networks.
Dark Fibre Testing
Partners:
Indigo & Google
Location:
Europe
Date:
Ongoing
Services:
Dark fibre testing, optical performance validation, reporting
Project Overview:
KMS Communications successfully completed dark fibre testing in London in partnership with Indigo and Google, ensuring the quality and readiness of fibre routes for future high-capacity connectivity. This work involved precise optical testing, including OTDR traces and power measurements, to validate infrastructure performance. Building on this successful collaboration, we are set to continue dark fibre testing at key locations across Europe throughout 2025 and 2026. This project highlights our growing role in critical network deployments, driven by our commitment to Knowledge, Mastery, and Support.
Read More
Fibre Cabinet Staging & Installation
Partners:
Xantaro & Freedom Fibre
Location:
Shropshire, UK
Date:
2025
Services:
Staging and installation of fibre cabinets
Project Overview:
KMS Communications collaborated with Xantaro & Freedom Fibre to support the rollout of broadband infrastructure across Shropshire. Our role involved the detailed staging and installation of fibre distribution cabinets, a critical component in enabling high-speed connectivity to homes and businesses. Working closely with project partners, we ensured every cabinet was installed to specification, on schedule, and with full adherence to safety and quality standards. This project reflects our ongoing commitment to Knowledge, Mastery, and Support in every installation we undertake.
Read More
Data Centre Fiber Installation
Partners:
Blue Network Solutions
Location:
Corsham, UK
Date:
2025
Services:
Fiber optic cable installation, routing, and testing
Project Overview:
KMS Communications was contracted to support a high-priority infrastructure upgrade at a secure data centre facility in Corsham. Our team installed and routed high-capacity fiber optic cabling throughout the facility, ensuring optimal network performance and reliability. Operating in a controlled environment with strict access protocols, we delivered the project with precision and efficiency — staying true to our values of Knowledge, Mastery, and Support at every step.
Nationwide Cabinet Hardware Upgrades
Partners:
Xantaro, Building Digital UK
Location:
Multiple sites across the UK
Date:
2025
Services:
Network hardware upgrades, equipment replacement, systems integration
Project Overview:
KMS Communications partnered with Xantaro and Building Digital UK to deliver a nationwide fibre cabinet upgrade across the UK. The project involved replacing legacy 7210 Service Access Switches and SC200 System Controllers with next-generation 7250 Switches and SC300 Controllers, enhancing network performance, reliability, and long-term scalability. With careful planning, secure site procedures, and skilled execution, we ensured seamless delivery — staying true to our values of Knowledge, Mastery, and Support.
Read More
Nationwide Cabinet Hardware Upgrades
Partners:
Xantaro, Building Digital UK
Location:
Multiple sites across the UK
Date:
2025
Services:
Network hardware upgrades, equipment replacement, systems integration
Project Overview:
KMS Communications partnered with Xantaro and Building Digital UK to deliver a nationwide fibre cabinet upgrade across the UK. The project involved replacing legacy 7210 Service Access Switches and SC200 System Controllers with next-generation 7250 Switches and SC300 Controllers, enhancing network performance, reliability, and long-term scalability. With careful planning, secure site procedures, and skilled execution, we ensured seamless delivery — staying true to our values of Knowledge, Mastery, and Support.